Sevastopol Russian Battlecruiser
The Kronshtadt-class battlecruisers were ordered for the Soviet Navy in the late 1930s. Two ships were started but none were completed due to World War II. These ships had a complex and prolonged design process which was hampered by constantly changing requirements and the Great Purge in 1937.
Sevastopol was built by Shipyard No. 200, 61 Communards in Nikolayev. She was laid down on 5 November 1939 and estimated as 11.6% complete on 22 June 1941. She was captured by the Germans when they occupied Nikolayev in late 1941, but the Germans did little with her other than to use some of her material for defensive positions and some was apparently shipped to Germany. Before the Germans evacuated the city they damaged her building slip and hull with explosives and made her a constructive total loss. She was ordered scrapped on 24 March 1947 and her dismantling began shortly afterwards. It was completed in 1948.